Pont de Québec

Project Overview

The Quebec Bridge, which extends over the St. Lawrence River from Sainte-Foy to Lévis, is currently the longest cantilever bridge in the world. Opened in 1914, the bridge supports road, rail and pedestrian traffic. However, in 2010, due to neglected repair work, the Quebec Bridge was placed on a list of 10 most threatened historic sites in Canada. Corrosion forced the Department of Transport to replace the guards on either side of the bridge bridge with steel panels to strengthen the integrity of the structure.

MAÎTRE D'OUVRAGEMinistre du Transport du Québec
ENTREPRENEUREDM Construction

Restoring the View

During the first phase of the Quebec Bridge rehabilitation project, 1.8-metre-high opaque steel noise barrier panels were installed along the west side of the bridge. While providing the required barrier performance, the solid panels significantly restricted views of the St. Lawrence River and surrounding landscape for motorists and pedestrians, leading to public concerns about their visual impact.

For the second phase of construction, transparent noise barrier panels were selected to preserve important sightlines while continuing to meet the project’s noise mitigation requirements. EKHO/BPDR was selected to design and supply transparent noise barrier panels for this historic Quebec City landmark.

The solution demonstrates how transparent bridge noise barriers can balance acoustic performance, safety, durability, and aesthetics - helping transportation infrastructure projects mitigate noise without compromising views or the surrounding environment.

New barrier with transparent panels running the length of the Pont de Quebec deck under floodlights at night

Preserving a Heritage Landmark

Les panneaux d’écran antibruit GS CC ‘’Transparent Noise Barrier’’ présentent des filaments de polyamide intégrés. Ces panneaux sont généralement utilisés pour les écrans antibruit montés sur structure. Les filaments de polyamide intégrés permettent la rétention des fragments, ce qui aide à maintenir les panneaux intacts lors de l’impact d’une collision. En cas d’impact par un véhicule, les filaments de polyamide intégrés maintiennent l’intégrité des panneaux et empêchent les fragments de tomber.

Durisol/BPDR est honorée d’avoir eu l’occasion de fournir une solution utile à la préservation de l’héritage pour répondre aux nombreux critères du client.

Night work on the Pont de Quebec: a worker in high-visibility gear on the deck beside a loader and the new panelled barrier

Key Sectors

roads and highways cover image

Highways & Roads

Engineered noise barriers, retaining walls, and safety hardware tested for the demands of modern transportation infrastructure.

Learn more about Highways & Roads

Ready to Solve the Next Challenge?

Partner with EKHO to deliver infrastructure solutions designed for today’s complexity and tomorrow’s opportunities. Together, we’ll shape smarter, more connected communities.

Related Projects

Explore Similar Work

Discover more projects that share similar solutions and applications.

Night work on the Pont de Quebec: a worker in high-visibility gear on the deck beside a loader and the new panelled barrier

Work With Us

Planning a similar project?

We bring decades of experience to infrastructure challenges of all sizes.