Interchange 33 Expansion, I-95

Sectors Serviced:

Project Overview

The Connecticut Department of Transportation (CTDOT) reopened Interchange 33 to I-95 this past November. The expansion grew the interchange from a single southbound – northbound entrance ramp onto the I-95, into a full “diamond” highway interchange featuring two southbound and northbound entrance ramps for the highway.

OwnerCTDOT
ContractorEmpire Paving
EngineerSTV
InstallerQuaker

Matching a Proven Roadside Design

After a noise study was conducted, it was determined that the noise levels after the expansion would affect the residential homes that back onto the highway.

With years of experience working with CTDOT, our absorptive walls are used exclusively regardless of whether there are parallel barriers or not as we are known for our quality and competitive pricing as compared to standard reflective precast.

The overall look of the wall, including pattern, color, and even the post facings, were all designed to match the roadside of a previous project we delivered just up the road across the Moses Wheeler Bridge.

Ranging in heights from 15 to 20 feet, there are several noise wall sections installed back-to-back over the course of two projects.

Interchange 33 Expansion, I-95

Wall Sections Across the Interchange

The first wall starts along I-95 Southbound and runs down an off ramp. Approximately 1300 linear feet is ground-mounted with a small 80-foot stretch mounted to Bridge 132.

The second wall that starts on the other side of the exit is similar in length and has a small structure mounted section as well for bridge 133.

The shortest of the wall sections is 500 feet and starts on the other side of the on ramp and ends at bridge 134. At the far end of the bridge is a retaining wall which our noise wall was mounted directly to for an impressive 500-foot span.

As the wall installations are now completed, transitions between the walls will use our NB15 panels to span between a post and then attach it to the back of a crash barrier and a ground mounted post that is embedded into the ground.

Interchange 33 Expansion, I-95

Key Sectors

roads and highways cover image

Highways & Roads

Engineered noise barriers, retaining walls, and safety hardware tested for the demands of modern transportation infrastructure.

Learn more about Highways & Roads

Ready to Solve the Next Challenge?

Partner with EKHO to deliver infrastructure solutions designed for today’s complexity and tomorrow’s opportunities. Together, we’ll shape smarter, more connected communities.

Related Projects

Explore Similar Work

Discover more projects that share similar solutions and applications.

Interchange 33 Expansion, I-95

Work With Us

Planning a similar project?

We bring decades of experience to infrastructure challenges of all sizes.