Modernize the I-75

Sectors Serviced:

Project Overview

As progress continues on the I-75 Modernization Project within Oakland County, Michigan, the MDOT’s Segment Two of the massive interstate highway widening and upgrading project is nearing the expected completion date and on track for November 2020.

OwnerMichigan DOT
EngineerWalsh/Toebe JV
InstallationParsons
GENERAL CONTRACTORWalsh/Toebe JV

Bringing Durisol to the Design-Build Table

As part of the reconstruction of the southbound lanes on the I-75, two-parallel noise absorptive walls were determined as per the Traffic Noise Modelling Software (TMN) which is used to determine noise wall feasibility.

With the extensive experience the contractor has had with EKHO on past projects within other parts of the States, the Walsh/Toebe Joint-Venture was confident when calling in our team to the design-build table.

While it was our first design and supply opportunity with MDOT, it was also their first-ever absorptive wall. By involving our team early-on in the project, they were able to leverage our complete in-house design capabilities to best optimize the noise walls.

Modernize the I-75

Custom Brickwork and Lasting Quality

From budget to delivery, EKHO worked with Walsh and Parsons to maximize every angle of the noise walls. A proven post and panel design was utilized from our available inventory. And while different from the other reflective systems on the project, the precast concrete posts, large-format single-sided absorptive EKHO panels, and custom retaining panels kept production efficient and cost effective.

The walls also required a custom brick pattern on both sides of the wall, as well as custom icon panels spaced along the wall. The icon or “accent” panels had a special aesthetic treatment using 8×8” stones to create a rectangular border.

This project will set a template and quality standard for future MDOT absorptive projects. When finished, it will have an attractive multi-tone brick pattern on both the absorptive roadway side and reflective residential side.

Panels were painted to create the true, multi-tone brick color scheme seen today.

Modernize the I-75

Key Sectors

roads and highways cover image

Highways & Roads

Engineered noise barriers, retaining walls, and safety hardware tested for the demands of modern transportation infrastructure.

Learn more about Highways & Roads

Ready to Solve the Next Challenge?

Partner with EKHO to deliver infrastructure solutions designed for today’s complexity and tomorrow’s opportunities. Together, we’ll shape smarter, more connected communities.

Related Projects

Explore Similar Work

Discover more projects that share similar solutions and applications.

Modernize the I-75

Work With Us

Planning a similar project?

We bring decades of experience to infrastructure challenges of all sizes.