Fire-Rated Barriers Protect Remote Yukon Transformer Station

Sectors Serviced:
Solutions:
Stewart Crossing, Yukon, Canada

Project Overview

Durisol is proud to have built the first Durisol thermal transformer barrier in Western Canada and continue the tradition of offering innovative solutions at the best value to our customers.

OwnerYukon Energy
InstallerFMI Installations Ltd.
Design ConsultantTetra Tech
MaterialRecycled wood fibers & concrete
Fire Rating2-hour (ULC-263)
MountingSteel columns, clipped panels

Rapid-Install Thermal Barriers for Yukon Transmission Line

In 2011, Yukon Energy built a new 172km long, 138kV transmission line from Carmacks to Stewart Crossing in the central Yukon Territory with the goal of connecting their northern and southern grids. Having one integrated transmission system has given Yukon Energy the ability to better manage their power and part of the recent infrastructure expansion was a new transformer station located in Stewart Crossing. Tetra Tech, a leading Canadian engineering firm with expertise in energy, infrastructure and mining, was engaged to design the new station.

Durisol sound barriers are a lightweight, patented product made from recycled wood fibers and concrete and has been manufactured for over 30 years as an absorptive sound wall. Most importantly, Durisol is rated as a non-combustible material when tested in accordance with the Standard for Fire Tests of Building Construction and Materials, ULC-263.

Fire Rating

Two-hour ULC-263 certified

Fire Barriers Safeguard 138kV Transformer Station

After careful research, Tetra Tech determined that the Durisol wall was the best product to meet the required two-hour fire rating. In this case Tetra Tech elected to provide Durisol with the steel column layout. Durisol also has the in-house ability to design the steel columns required for thermal walls but it was decided that Tetra Tech would be better equipped to handle this portion of the scope because pile supports were required for the infrastructure at the site.

Assembly proceeded smoothly and was completed by FMI Installations with a four man crew in two days. The Durisol facing panels were first clipped over the steel columns. Panels were then lifted by a small crane and lowered between the flanges of the two steel columns.

Key Sectors

Energy & Utilities

Durable precast solutions for substations, pipeline corridors, and critical infrastructure protection.

Learn more

Ready to Solve the Next Challenge?

Partner with EKHO to deliver infrastructure solutions designed for today’s complexity and tomorrow’s opportunities. Together, we’ll shape smarter, more connected communities.

Related Projects

Explore Similar Work

Discover more projects that share similar solutions and applications.

Work With Us

Planning a similar project?

We bring decades of experience to infrastructure challenges of all sizes.