EKHO is proud to have built the first Fire Separation Walls & Enclosures
in Western Canada and continue the tradition of offering innovative solutions at the best value to our customers.

OwnerYukon Energy
InstallerFMI Installations Ltd.
Design ConsultantTetra Tech

A Non-Combustible Fire Wall

In 2011, Yukon Energy built a new 172km long, 138kV transmission line from Carmacks to Stewart Crossing in the central Yukon Territory with the goal of connecting their northern and southern grids. Having one integrated transmission system has given Yukon Energy the ability to better manage their power and part of the recent infrastructure expansion was a new transformer station located in Stewart Crossing. Tetra Tech, a leading Canadian engineering firm with expertise in energy, infrastructure and mining, was engaged to design the new station.

EKHO Noise Barriers are a lightweight, patented product made from recycled wood fibers and concrete and has been manufactured for over 30 years as an absorptive sound wall. Most importantly, it is rated as a non-combustible material when tested in accordance with the Standard for Fire Tests of Building Construction and Materials, ULC-263.

After careful research, Tetra Tech determined that the EKHO wall was the best product to meet the required two-hour fire rating. In this case Tetra Tech elected to provide EKHO with the steel column layout. EKHO also has the in-house ability to design the steel columns required for fire walls but it was decided that Tetra Tech would be better equipped to handle this portion of the scope because pile supports were required for the infrastructure at the site.

Durisol Transformer Thermal Barriers

Fast, Simple Installation

Assembly proceeded smoothly and was completed by FMI Installations with a four man crew in two days. The EKHO facing panels were first clipped over the steel columns. Panels were then lifted by a small crane and lowered between the flanges of the two steel columns.

“We were expecting some difficulty as this was our first time installing the fire wall panels. The installation ended up being the easiest part of the project”

Andrew Farnsworth, Project Foreman, FMI Installations

Key Sectors

Ready to Solve the Next Challenge?

Partner with EKHO to deliver infrastructure solutions designed for today’s complexity and tomorrow’s opportunities. Together, we’ll shape smarter, more connected communities.

EKHO Transformer Thermal Barriers

Work With Us

Planning a similar project?

We bring decades of experience to infrastructure challenges of all sizes.